Past projects
CO-OP Refinery Regina - Spring TAR
Client: CO-OP
Assignment: Integral Quality Management provided ten (10) Quality Control Inspectors including eight (8) field inspectors and two (2) quality leads. Monitoring and Surveillance Exchanger/Piping/PSV Servicing and Repair.
Suncor Firebag - Spring/Summer TAR
Client: Suncor Energy
Assignment: Integral Quality Management provided sixteen (16) Quality Control Inspectors including fourteen (14) field inspectors and two (2) quality leads. Monitoring and Surveillance Exchanger/Piping/PSV Servicing and Repair.
CF Industries Medicine Hat - Reformer Harp Section Replacement
Client: CF Industries
Assignment: Integral Quality Management provided Quality Control Leads and Field Visual Inspectors for complete Harp Section Replacement. Scope involved various alloys and unspecified materials during repair.
Suncor Firebag - OTSG On-Going Repairs and Maintenance
Client: Suncor Energy
Assignment: Integral Quality Management provided Quality Control Leads for the past five (5) years for on-going maintenance and repairs on the onsite OTSG’s at Suncor Firebag. Repair’s on Economizers, Radiants and Convection sections.
Suncor MacKay River - HRSG Tube and Bend Replacement
Client: TransCanada
Assignment: Integral Quality Management provided Quality Control Leads and field visual inspectors for the tube and bend replacement project at Suncor MacKay River for TransCanada.
Cenovus Foster Creek and Christina Lake Projects
Client: Cenovus Energy
Assignment: Integral Quality Management provided Quality Control Leads on a on-going basic for the Exchanger Regulatory Inspection Program. Repairs and Servicing on various Heat Exchangers and other Pressure Equipment.